Block production
Plan block batches from the output you need to produce.
Batch yield, cement, sand, curing and breakage can become disconnected from the number of finished blocks required.
The field problem
Make every assumption visible before it becomes a purchase.
An editable production starting point that exposes the batch yield being assumed.
- 1Set the finished-block target
Check this stage with the person responsible before continuing.
- 2Confirm blocks and materials per trial batch
Check this stage with the person responsible before continuing.
- 3Add a production allowance
Check this stage with the person responsible before continuing.
- 4Review total batches, materials and starting cost
Check this stage with the person responsible before continuing.
BlockToBlock principle
Fast does not mean automatic approval.
Calculations organise the information you provide. The estimator remains responsible for measurements, specification, prices, constructability and site decisions.