Concrete work
Turn slab dimensions into a checked material starting point.
Volume, mix ratio, waste and purchasing units are easy to disconnect when they live in separate notes.
The field problem
Make every assumption visible before it becomes a purchase.
A transparent concrete calculation that remains editable when site conditions change.
- 1Enter length, width and depth
Check this stage with the person responsible before continuing.
- 2Confirm the working mix and waste
Check this stage with the person responsible before continuing.
- 3Review cement, sand and aggregate
Check this stage with the person responsible before continuing.
- 4Apply supplier and delivery costs
Check this stage with the person responsible before continuing.
BlockToBlock principle
Fast does not mean automatic approval.
Calculations organise the information you provide. The estimator remains responsible for measurements, specification, prices, constructability and site decisions.
Read the calculation methodology →