Mortar
Connect net wall area to an explicit mortar allowance.
Joint thickness, block type and workmanship change mortar demand, so a hidden universal factor is not enough.
The field problem
Make every assumption visible before it becomes a purchase.
A transparent material allowance that can be adjusted to the actual masonry system.
- 1Confirm the net wall area
Check this stage with the person responsible before continuing.
- 2Set working mortar consumption per square metre
Check this stage with the person responsible before continuing.
- 3Review cement and sand factors
Check this stage with the person responsible before continuing.
- 4Apply local prices and waste
Check this stage with the person responsible before continuing.
BlockToBlock principle
Fast does not mean automatic approval.
Calculations organise the information you provide. The estimator remains responsible for measurements, specification, prices, constructability and site decisions.
Read the calculation methodology →