Low-connectivity sites
Keep estimating when the connection disappears.
A site tool becomes a liability when measurements or project records depend on continuous connectivity.
The field problem
Make every assumption visible before it becomes a purchase.
A resilient workflow designed around local data first, with optional connectivity added carefully.
- 1Prepare prices before travelling
Check this stage with the person responsible before continuing.
- 2Calculate and save locally on site
Check this stage with the person responsible before continuing.
- 3Review the result with the crew
Check this stage with the person responsible before continuing.
- 4Export when the job is ready—not when the network allows
Check this stage with the person responsible before continuing.
BlockToBlock principle
Fast does not mean automatic approval.
Calculations organise the information you provide. The estimator remains responsible for measurements, specification, prices, constructability and site decisions.
Read the calculation methodology →